Skip to content
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

180° Rotation

Save 19% Save 19%
Original price €680,00
Original price €680,00 - Original price €680,00
Original price €680,00
Current price €548,00
€548,00 - €548,00
Current price €548,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : FLCM-FLN-PA-01

AT A GLANCE


Payload
5-7.5 kg
Waist hip strap length
Min - Max: 81 cm - 125 cm
Compatible With
Camera And Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Assured Smooth Stabilized Shots & Comfort All Day Long!

01.

BACKBREAKER HAND-HELD WORK – NOT ANYMORE
We understand extended handheld camerawork can prove to be a backbreaker. But if you have a Body Support rig, it solves your problem up to a great extent.
Flycam Flowline rig takes the weight off your shoulders & arms and distributes it across the entire back which makes it convenient for you to shoot for a longer period without getting tired.
As there is less pressure on your arms now, you’ll be able to capture more stable & smoother shots.
Note: It is recommended to attach the minimum required weight (5kg / 11lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)
Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

02.

IMPORTANT NOTE
You might receive the Placid arm paired with one of the following vests:
Vest 1: Features a tension adjustment knob and a dedicated hole for easier Placid attachment. It also has a shorter, one-piece extension for a streamlined design.
Vest 2: Utilizes a tension adjustment lever and requires flipping the extension for Placid attachment. It has a longer, two-piece extension for added adjustability.
No need to worry! Whichever version you receive, the Placid Arm is fully compatible with both vests and offers similar functionality.

03.

PERFECT VERTICAL STABILIZATION!
The Flycam Placid 2-axis Spring Arm is a perfect companion for your flowline rig in getting a Smooth Shot. It adds an additional vertical stabilization & eliminates errors caused by the operator’s motion. It comes with two springs for variable payloads. You can interchange them as per the weight of your camera setup. You can balance the setup & adjust the spring tension by adjustment knob.

Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)
Flycam Flowline Starter with Placid Stabilizing Arm for Camera & Gimbals (5-7.5kg/11–16lb)

04.

QUALITY THAT LASTS LONG
The body vest is made up of strong yet ergonomic fabric that has minimal wear & tears & stays for long.
The arm pole of the flowline rig & the placid arm are constructed with high-grade Aluminum Alloy that ensures stability, strength & durability.
The Springs used in the Placid are made up of Stainless Steel that certifies complete corrosion resistance & long-term value.

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE

Flowline Weight

  With Liver Jacket :- 3.6kg / 8lb
  Without Lever Jacket :- 3.8kg / 8.3lb

Height

  Mounted: 100 cm
  Folded: 60 cm

Suspension line

  length (Rope) :- 152.5 cm
  Material :- 3mm Nylon

Top Bar Length

  With Liver Jacket :- 560mm
  Without Lever Jacket :- 480mm

Support Arm Rotation

  180°

Waist hip strap length

  Min - Max: 81cm - 125cm | 32inch - 49inch

PLACID ARM

Construction

  High-grade Aluminum, Carbon Steel, Stainless Steel, EPDM rubber

Height

  205mm

Width

  395 mm

Depth

  65mm

Tilt Range

  40° Up/ Down

Weight of product

  1.80kg / 3.96lb

Foam Packing Dimension

  LxWxH : 42cmx20.5cmx12cm

Weight(With packing)

  2.40kg/5.29lb

IN THE BOX

FLYCAM Basic Flowline with 180° Rotation
FLYCAM Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA)
2 x Tension Spring
Safety shock cord
Bag


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • Will the placid arm work as an stabilizer?

    Yes it will. It works to help minimize both vertical and side-to-side vibration.

  • If you pull down camera to get a lower shot, shouldn't the "string" go back up when releasing weight? Or is it setting height and that's where it is? I know the Swedish Easy Rig the string/cable will go up and down.

    Yes, The cord is tensioned and will retract, and adjust to the level of your camera payload. The cord will retract as you raise your camera payload.

  • Is it suitable to use it with a camera setup less than 6.6 Ib?

    No, it will not work effectively with cameras/camera rigs that weigh less than 6.6lbs.

  • Is the placid arm already affixed to the vest & system? I'm asking so I wouldn't have to do it myself.

    Yes, the Placid arm comes assembled.

  • What if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?

    The weight capacity of B-FLCM-FLN-01 is 5-7.5kg/11–16lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.

  • What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?

    M4 X 12MM

x