Skip to content
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.

Flycam Flowline Starter Body Rig for Camera & Gimbals (3-7.5 kg / 6-16 lb) - B Stock

Original price €168,00 - Original price €168,00
Original price
€168,00
€168,00 - €168,00
Current price €168,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : B-FLCM-FLN-02

AT A GLANCE


Payload
3-7.5 kg
Support Arm Rotation
180°
Flowline Weight
Complete 3.6kg
Compatible With
Camera and Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Capture Steady Footage Effortlessly, Relieving Your Back And Arms!

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness. Note: To ensure proper operation of your Flycam Flowline system, it is recommended that you attach the minimum required weight (3 kg / 6lb) for pulling down the balancing rope.

Flycam Flowline Starter Body Rig for Camera & Gimbals 3-7.5 kg 6-16 lb - B Stock
Flycam Flowline Starter Body Rig for Camera & Gimbals 3-7.5 kg 6-16 lb - B Stock

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulders, letting you hold the camera steady for a longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar, with 180° Rotation capability, allows easy camera movements from different angles. The Support Rope also adds a point of contact, which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb/16lb). The spring tension can be easily adjusted to perfectly balance the weight of your camera setup using the knob with a lever above it on the back of the rig.

Flycam Flowline Starter Body Rig for Camera & Gimbals 3-7.5 kg 6-16 lb - B Stock

IN-ACTION VIDEOS

SPECIFICATIONS

Payload Capacity

  Min-Max: 3kg - 7.5kg (6lb -16lb)

  NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE- V1) with this Flowline model will impact the minimum and     maximum payload capacities.

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6kg | 8lb

Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Suspension line

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Waist hip strap length

  Min - Max: 81cm - 125cm | 32inch - 49inch

IN THE BOX

Flycam Flowline Starter
2 x Washer
2 x 4mm knobs
1 x 2.5mm L-Type Allen Key
2 x 1ft each Velcro
Bag Packing

USER MANUAL


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products


Q&A

Have a Question?

Ask a Question



Newsletter sign-up

You can subscribe without accepting optional cookies.

By selecting Subscribe, you agree to receive Proaim product updates and offers by email. You can unsubscribe at any time. Privacy policy

x