Skip to content
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.
All prices on the website are VAT exclusive. B2C customers can visit at https://www.proaim.be/ to get VAT inclusive pricing.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

3 reviews
Save 7% Save 7%
Original price €820,00
Original price €820,00 - Original price €820,00
Original price €820,00
Current price €764,00
€764,00 - €764,00
Current price €764,00
or Buy now, pay later. Choose Klarna Pay Later / Slice it during checkout.

SKU : FLCM-FLN-MSTR-02

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline Master takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight (4kg / 8.81lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

02.

THE FLOWLINE MASTER VEST
Ergonomically designed Flowline Master Vest ensures more support around the Shoulders and Back, allowing you to mount large setups and shoot comfortably for a longer duration. It has a flexible belt system & adjustable vest rods on sides, which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline Master System fits multiple Camera and Gimbal Setups between the weight range of 4kg/9lbs to 12kg/27lbs.You can even adjust the spring tension to balance the load placed on the Support Rope by turning the knob present on the back of the rig.
Also, the top bar allows for 180° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials, the Flycam Flowline Master is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)

IN-ACTION VIDEOS

SPECIFICATIONS

Payload Capacity

Min-Max: 4kg - 12kg (9lb - 27lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Knob Type

  Anti Slip Ratchet Knob

Height 

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Suspension Line 

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch when fully stretched

Top Bar 

   Length Including Extension: 46cm | 18inch
   Length Excluding Extension: 32cm | 13inch

Waist hip strap length

  Min - Max: 81cm - 125cm (32inch - 49inch)

Extension Length

  14cm | 5.5inch

Product Weight (without packing)

  4.7kg / 10.5lb

IN THE BOX

Flycam Flowline Master Professional Support for Camera & Gimbals (4-12kg/9-27lb)
Bag

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products


Customer Reviews
5.0 Based on 3 Reviews
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
AB
06/01/2021
adisa b.
Filmmaking with ease

This is my favorite piece of stablizing equipment.

MD
04/19/2020
Malyssa D.
AWESOME BUY

Great for cinematographers that like to go handle

JB
06/27/2019
Jiwon B.
Works Well!

I've never used an easyrig but this feels very secure and holds the weight of a moderately heavy rig nicely.




  • Can the tension be adjusted for different setups?

    Yes. Spring tension is easily adjustable using the rear tension control knob.

  • Can it fit different body types?

    The adjustable vest rods and flexible belt system allow a secure, comfortable fit for most users.

  • Is there a minimum weight requirement to use it properly?

    Yes. A minimum load of 4kg / 9lb is recommended to ensure proper rope tension and operation.

  • How do I adjust the height?

    The Flycam Flowline Master 2 Professional Support Vest for Cameras & Gimbals has an optional height riser for vertical extension of the top bar.
    It is Flycam Height Riser for Flowline Body Support Rigs (FLN-HR-4)

  • what is the difference between 180° and 360°?

    The only difference between the 180° and 360° model is the support arm rotation.

x